How the concrete bags formula works

Bagged concrete is sold by weight, but each bag yields a fixed volume once mixed. So the calculation has two steps: work out the volume of your slab in cubic feet, then divide by the volume one bag produces.

Volume in cubic feet = length (ft) × width (ft) × thickness (in) ÷ 12

Bags = volume ÷ bag volume

Bag volumes: 80 lb bag = 0.6 cu ft, 60 lb bag = 0.45 cu ft, 40 lb bag = 0.3 cu ft

Cubic yards: 27 cu ft = 1 cubic yard

Bags per yard: it takes 45 bags of 80 lb to make one cubic yard (27 ÷ 0.6 = 45).

The calculator adds your chosen waste allowance to the volume first, then rounds the bag count up — you can't buy part of a bag, and running short mid-pour is far worse than having one spare.

Worked example

A concrete pad 4 ft × 4 ft, 4 inches thick, using 80 lb bags:

Volume: 4 × 4 × 4 ÷ 12 = 5.33 cu ft

Bags: 5.33 ÷ 0.6 = 8.9 → 9 bags of 80 lb

Cost: at $6/bag ≈ $54

With 10% waste: 5.87 cu ft → 10 bags ≈ $60

That is exactly what the calculator shows with its default values — change the size, thickness or bag size and it recalculates instantly.

How much do concrete bags cost? (US, 2026)

Prices vary by region, store and brand. Use these ranges as a starting point and check local prices before buying.

OptionTypical price
80 lb bag$5–$7
60 lb bag$4–$6
40 lb bag$3–$5
Ready-mix delivery (per cubic yard)$140–$200
Concrete mixer rental$50–$100 per day

Waste allowance

Add 10% for spillage and an uneven sub-base. For rough or unlevelled ground, use 15%. Never buy the exact calculated amount — one extra bag is cheaper than a second trip to the store, and a half-finished pour is hard to fix.

For jobs over about 1 cubic yard (27 cu ft / 45 bags of 80 lb), ready-mix delivery is usually cheaper and easier than bags: no mixing, no lifting dozens of heavy bags, and a more consistent mix.

Frequently asked questions

Which bag size should I buy?

80 lb bags are best for slabs and larger pours (fewer bags to mix); 60 lb and 40 lb bags suit small repairs and are easier to carry.

How much water per bag?

About 3 quarts (0.75 gal) per 80 lb bag; add water slowly and mix to a workable consistency — too much water weakens the concrete.

How do I mix bagged concrete?

In a wheelbarrow or mixer: pour the dry mix, add most of the water, mix until uniform, use within about 30–60 minutes.

When should I use ready-mix instead of bags?

For anything over about 1 cubic yard (45 bags of 80 lb) — ready-mix is cheaper, faster and more consistent.

How long does concrete take to cure?

It sets in a few hours and is walkable in 24–48 hours, but reaches full strength in about 28 days; keep it damp and avoid heavy loads for the first week.